NORMALIZE BEFORE YOU RANK

Pool Builder Proposal Comparison Matrix

Copy every bid into the same rows. Mark each item included, excluded, allowance, provisional, owner supplied, separate contract, option, or unclear before comparing totals.

Work packageDetails to compareProposal status
Design & approvalsSurvey, design, engineering, plans, submissions, fees, comments, revisionsIncluded / excluded / allowance / unclear
Access & site workProtection, demolition, excavation, soil, rock, groundwater, utilities, restorationIncluded / excluded / allowance / unclear
Pool systemDimensions, structure or shell, plumbing, fittings, testing, finish or linerIncluded / excluded / allowance / unclear
Equipment & utilitiesExact models, hydraulics, electrical, gas, heating, sanitation, controls, lightingIncluded / excluded / allowance / unclear
Surrounding workCoping, deck, drainage, barriers, landscaping interfaces, cleanupIncluded / excluded / allowance / unclear
Commercial controlsTaxes, allowances, exclusions, owner work, payments, changes, substitutionsIncluded / excluded / allowance / unclear
Delivery processManager, supervisor, trades, schedule, inspections, corrections, reportingIncluded / excluded / allowance / unclear
CloseoutStartup, training, punch list, approvals, manuals, registrations, warranties, recordsIncluded / excluded / allowance / unclear

SELECTION MEMO

Explain the difference, not only the total

  1. Material scope and product differences
  2. Uncertain conditions and allowance exposure
  3. Owner work and coordination gaps
  4. Schedule, payment, and change controls
  5. Required clarifications before signing